please help:If Sam can do a job in 4 days that Lisa can do in 6 days and Tom can do in 2 days, how long would the job take if Sam, Lisa, and Tom worked together to complete it
Still Need Help?
Join the QuestionCove community and study together with friends!
Sign Up
OpenStudy (anonymous):
hi
OpenStudy (anonymous):
please help me to solve this one
OpenStudy (anonymous):
I think 12/11 of a day
OpenStudy (anonymous):
not so sure
OpenStudy (anonymous):
tell me what is your equation you have?
Still Need Help?
Join the QuestionCove community and study together with friends!
Sign Up
OpenStudy (amistre64):
how much of the job is done by each person in one day?
OpenStudy (anonymous):
1/2 1/4 and 1/16
OpenStudy (amistre64):
S takes 4 days to do it alone; in 1 day S does 1/4 of the job
L takes 6 days to do it alone; in 1 day L does 1/6 of the job
T can do it all in 2 days; in 1 day T does 1/2 the job
How much is done in one day if they all work together?
OpenStudy (anonymous):
1/2+1/4+1/6
OpenStudy (amistre64):
very good :)
1/2 = 6/12
1/4 = 3/12
1/6 = 2/12
----------
11/12 is done in one day.
Still Need Help?
Join the QuestionCove community and study together with friends!
Sign Up
OpenStudy (amistre64):
since the work is divided into 12 parts; and 11 parts get done each day we get:
11 * days = 12
days = 12/11
OpenStudy (anonymous):
ok thanks
OpenStudy (amistre64):
do you need that in hours and secs and such? or is that a good enough answer :)
OpenStudy (anonymous):
yes
OpenStudy (anonymous):
haha I was right...
Still Need Help?
Join the QuestionCove community and study together with friends!