Concrete must be purchased by the cubic yard. How much will it cost to pour a slab of pavement 11 feet by 11 feet by 3 inches for a patio if the concrete costs $63.00 per cubic yard?
Convert each dimension in 11 ft x 11 ft x 3 into yards. Multiply them to find the total volume in cubic yards and then multiply by $63 to find the total cost.
@ranga I'm about to sound really dumb but how do you convert feet into yards? It's been a while since I've done that.
1 yard = 3 feet Divide no. of feet by 3 to convert to yards.
So divide 11/3 ? and then what about the three inches?
1 yard = 3 feet 1 foot = 12 inches Therefore, 1 yard = 36 inches. Divide no. of inches by 36 to convert into yards. Also, if you want to find out the conversion factor, then in Google you can type; yard in inches inches in yards feet in yards etc. to get the conversion factors.
Ok. So I did all that and my answer wasn't one of the options given.
what is the answer you got from the calculations?
Well I got 3.66 yd x 3.66 yd x 0.08 yd. I then multiplied by $63 and got 466.20
Error in multiplication. check again.
What did I do wrong?
I just plugged it in again and it said the same thing.
I multiply the same four numbers and get a very different result than yours.
Really? Hmm. Let me try again
Also, to avoid rounding off errors, I'd wait until the end to round off. 11/3 * 11/3 * 3/36 * 63 = ?
Oohhhh wait I see what I did wrong! I added instead of multiplied. Oops haha
So for my new answer I got $70.58
That is what I got. Does it match any of the answer choices?
Yep
alright.