A building contractor needs to have a slab foundation poured for a new building. The structure will be 24 feet long, 20 feet wide, and will be 5 stories high. For a structure this tall, the foundation needs to be 3 feet thick. How many cubic feet of cement does the contractor need for the slab foundation? 1,496 ft3 1,567 ft3 1,440 ft3 1,384 ft3