(HELP PLEASE, kind of have trouble towards the end maybe) Jeff and kirk can build a 75 -ft. retaining wall together in 4 hours. because Jeff has more experience, he could build the wall by himself in 1 hour quicker than kirk. How long would it take kirk (to the nearest minute) to build the wall by himself? ( I know kirk takes t+1 (1/t+1) jeff would be 1/t and the eqution would be 4/t + 4/t+1=1 but after this I seem to get lost and get the wrong answer)
sorry i can't help u
HI!! do you know what the right answer is ?
no I don't I tried what I had gotten and it was wrong I only have about two or three chances left.
if that is really the equation (and it looks like it to me) then we can solve it
yeah pretty sure it is
\[\frac{4(2x+1)}{x(x+1)}=1\] or \[4(2x+1)=x^2+x\] solve that quadratic equation, you need the formula
I got 7.53 and -0.53, this is were I most likely got stuck how to I turn these to into minutes?